Surface Dressing on Chestnut Avenue

Just a quick update for you!

BCC have ‘loose chippings ‘ signs up and a 20mph speed limit is in force along Chestnut Avenue. Surface dressing requires a bedding in period which is aided by the road being trafficked. BCC will carry out a sweep after a couple of days and a further sweep after 10 – 14 days, after which any lining can be carried out. Lining is usually completed within 4 weeks of the surface dressing.

Uncategorised

Comments are disabled.